Municipal Code
Chapter 18. General Zoning Ordinance
Sec. 18-38. (IP) Industrial Park Zoning District
(1) Intent. This district is intended to accommodate high-quality industrial, office, and related land uses at an intensity that is compatible with the overall community character of the City. (2) Principal Uses Permitted by Right. Refer to Article III for detailed definitions and requirements for each of the following land uses. (a) Small Scale Indoor Institutional (b) Cultivation (c) Community Garden (d) Outdoor Open Space Institutional (e) Passive Outdoor Recreation (f) Essential Services (g) Small Scale Public Services and Utilities (h) Office (i) Personal or Professional Service (j) Artisan Studio (k) Light Industrial (l) Research, Development, and Related Manufacturing (m) Indoor Maintenance Service (n) Communication Antenna
(3) Principal Uses Permitted as Conditional Use. Refer to Article III for detailed definitions and requirements for each of the following land uses. (a) Large Scale Indoor Institutional (b) Group Daycare Center (c) Animal Boarding (d) Active Outdoor Recreation (e) Indoor Storage and Wholesaling (f) Transit Center (g) Distribution Center (h) Off-Site Parking (i) Communication Tower
(4) Accessory Uses Permitted by Right. Refer to Article III for detailed definitions and requirements for each of the following land uses. (a) Satellite Dish (b) Personal Antenna and Tower (c) Nonresidential Accessory Building (d) Recreational Facility (e) Landscape Feature (f) Deck (g) Outdoor Wood Boiler (h) On-Site Parking (i) Company Cafeteria (j) Onsite Ancillary Use (k) Solar Energy System
(5) Accessory Uses Permitted as Conditional Use. Refer to Article III for detailed definitions and requirements (a) Small Wind Energy System (b) Solar Energy System
(6) Temporary Uses. Refer to Article III for detailed definitions and requirements for each of the following land uses. (Exempt from setbacks unless specified in Article III.) (a) Temporary Outdoor Sales (b) Temporary Outdoor Assembly (c) Temporary Storage Container (d) Temporary Construction Storage (e) Temporary Contractor's Project Office (f) Temporary On-Site Real Estate Sales Office (g) Garage or Estate Sale
(7) Density, Intensity, and Bulk Regulations for the (IP) Industrial Park District. | | Nonresidential Uses | | Minimum Lot Area | 20,000 square feet | | Maximum Building Coverage of Lot | 50 percent | | Minimum Lot Width | 100 feet | | Minimum Front Setback | 50 feet | | Minimum Street Side Setback | 25 feet | | Minimum Side Setback | 25 feet (50-foot minimum side yard abutting existing dwellings or residential district) | | Minimum Rear Setback | 25 feet (50-foot minimum rear yard abutting existing dwellings or residential district) | | Major Street Setback | Minimum of 50 feet or mean of adjoining lots (see Section 18-12 and 18-72) | | Maximum Principal Building Height | 50 feet | | Minimum Principal Building Separation (multi-structure developments on shared lots) | 30 feet | | Minimum Pavement Setback (lot line to pavement; excludes driveway entrances and lots that are 50 feet wide or less) | 3 feet from side or rear, or 0 feet for shared driveway;10 feet from right of way | | Accessory Building Side Setback | 3 feet | | Accessory Building Rear Setback | 5 feet | | Maximum Detached Accessory Building Height | 25 feet or the height of the principal structure, whichever is less | | Minimum Parking Required | See Article III |
Back to Chapter Table of Contents
|