View of the west wall looking from southeast to the northwest |
View of the west wall looking from southeast to the northwest |
 |
 |
|
View of the south wall of the office area - note concrete planking installed creating second
floor |
View of the 30,000 gallon rain water collection tank. This tank will have concrete
planking placed over its top which will be the floor for two rooms |
 |
 |
| View from the southeast looking to the northwest - this is the
wall between the second and third apparatus bays |
View of the north wall of the first and second apparatus bays |
 |
 |
|
View of the north wall of the first and second apparatus bays |
View of the north wall of the first and second apparatus bays |