March 23, 2009 picture of steel reinforcing for the apparatus floor in the ambulance bays
1 day prior to pouring |
View of the ambulance bay floor after being poured |
 |
 |
|
View of the car bays heating coils installed over foam insulation - steel reinforcing still
needs to be added |
View of the pipe chase in the southeast corner of the car bays - Note the four pipes to the left
of the pipe chase which are the pipes for the geothermal heating. |
 |
 |
|
View of the gear storage room with drains, heating coils and steel reinforcing installed - floor
is scheduled to be poured on 3/20/10 |
Preparation and grading of the main apparatus floors prior to installation of the heating coils |
 |
 |
|
View to the north of bays 3, 4 & 5 |
Upstairs door frames receive their final color |
 |
|
|
View of the display shelves in the second floor study |
|