Door Frames are painted in second floor Dorm Rooms |
Decking for balcony over rear door overhand is installed |
 |
 |
|
Red accent wall is painted in second floor Day Room |
Second Floor display cases are framed out |
 |
 |
|
Concrete floor is poured in south apparatus bay which will hold the two station cars |
Concrete floor is poured in south apparatus bay which will hold the two station cars |
 |
|
|
In-floor heat tubing is installed on main apparatus floor |
|