April 1, 2010

 

Door Frames are painted in second floor Dorm Rooms Decking for balcony over rear door overhand is installed
Red accent wall is painted in second floor Day Room Second Floor display cases are framed out
Concrete floor is poured in south apparatus bay which will hold the two station cars Concrete floor is poured in south apparatus bay which will hold the two station cars
 
In-floor heat tubing is installed on main apparatus floor  

 

 