View of the dry walling of the Lobby facing north |
View of the dry walling of the Lobby facing west |
 |
 |
|
View of the Chief's office |
View of the office hallway facing south |
 |
 |
|
View of the west 2nd floor hallway showing the sets of 3 lockers per sleeping room |
View of the west 2nd floor hallway showing the sets of 3 lockers per sleeping room |
 |
 |
|
View of the fire pole cage (not fully installed) |
View of the 2nd floor mechanical room - Note the 4 black pipes in the center of the picture
which are part of the geothermal heating/cooling system |
 |
|
|
View of the generator pad and surrounding walls (SE corner of the building) |
|