Back ramp concrete installation |
Back ramp concrete installation |
 |
 |
|
Painting of apparatus bays 6 & 7 |
View of second floor south elevator door installation |
 |
 |
|
Ceiling tile grid installation in kitchen |
Front view of fire station looking to the east |
 |
|
|
Construction of rain garden in SE corner of site |
|